Monaco F1 Grand Prix track

Monaco F1 Grand Prix track We were approached by Colas, the main contractor for the Circuit de Monaco, to address the safety concerns they had ahead of the F1 Grand Prix. Following a detailed remote consultation process, we laid 1500m2 of resin-based high friction surfacing using one of our specialist screed trucks between turns 9…

Emergency Refuge Areas, M1

Emergency Refuge Areas, M1 junctions 10-13 We were hired to lay high friction surfacing within the emergency refuge area bays on this site, working to the specification that was provided by Highways England. Our team laid an MMA resin that was dressed with BUFF bauxite. Once this resin had cured, any loose aggregate was swept…

Alperton Train Station

Alperton Train Station We were hired to design and install imprint surfacing, working closely with the client to ensure that the chosen design and colour was tailored to their preferences. As part of this process, our team prepared a suitable base, installed 100mm x 100mm crossing studs, and laid 15mm of thermoplastic surfacing. The client’s…

Battery Hill

Battery Hill We were hired to replace all the ironwork on site, removing any raised fixtures and installing them at the correct height. This was part of a large resurfacing project carried out by another contractor, requiring us to work according to their schedule within the moving road closure that was in place. Falling behind…

Belvedere Bridge

Belvedere Bridge We were hired to renovate this bridge over a railway track, ensuring that the steps and walking platform would be safe until a major overhaul could be programmed at a later date. This involved removing all the existing loose anti-slip material that had been laid long ago, addressing the rust that had developed…

Bromley Cricket Club

Bromley Cricket Club We were hired to lay asphalt surfacing in place of some of the aging paving slabs found around the cricket club. These were starting to become trip hazards and required increased maintenance, making it simpler and more cost-effective to replace them entirely. Since the client was preparing to install a lift for…

High friction surfacing, A12

High friction surfacing, A12 We were hired to lay 2,000m2 of MMA high friction surfacing within junctions 22 and 23 of the A12, working to the specification provided by Highways England. Project scope This was a high friction surfacing project that was completed over four days. Challenges This project required us to adapt to extremely…

A303, Stonehenge

A303, Stonehenge We were hired to replace all the gullies within a specific section of the A303 that passes by Stonehenge. The client needed us to work alongside their existing surfacing contractor and to follow their schedule to ensure that the work was completed by the target date. As the client required a reliable replacement…

High friction surfacing, London Borough of Bexley

High friction surfacing, London Borough of Bexley We were hired to complete three high friction surfacing projects within the same borough, carrying out three complex road closures and diversions over the course of three nights. We laid a hot-applied solution over newly installed crossing points and junctions at Yarnton Way, Gravel Hill, and Danson Road.…

McDonald’s, Boreham Interchange

McDonald’s, Boreham Interchange We were hired to complete this complex line marking project within a single night, making sure that there was minimal disruption for the restaurant’s customers. We worked closely with the client to understand their requirements in full, allowing us to plan and allocate our workload as effectively as possible. Project scope This…